From enquiry to handover

Export process

Each stage identifies what begins the work, what is controlled, what the buyer confirms and what moves forward.

Watch export proof

A visible handover path

Healthy plant material and traceable inputs start the crop journey.

Tissue culture & seedlings
01

Programme discovery

Define the sourcing objective before discussing a shipment.

Input
Product, destination, intended use and target window
Control
Check whether the enquiry contains enough commercial context
Buyer checkpoint
Confirm the initial sourcing brief
Output
Qualified programme brief
02

Specification alignment

Translate buyer needs into a confirmation list.

Input
Grade, maturity, packing, label and document expectations
Control
Separate required, preferred and destination-specific items
Buyer checkpoint
Approve the working specification
Output
Programme specification checklist
03

Supply coordination

Review source context and programme fit.

Input
Working specification and target timing
Control
Align product context, season and supplier questions
Buyer checkpoint
Review available programme context
Output
Supply coordination summary
04

Packing preparation

Organise handling around the agreed programme.

Input
Confirmed packing, label and handling instructions
Control
Coordinate receiving, sorting, packing and presentation checks
Buyer checkpoint
Confirm packing and label requirements
Output
Packing handover instruction
05

Logistics handover

Coordinate dispatch information and transport requirements.

Input
Packed product plan and destination details
Control
Align timing, transport condition and delivery term
Buyer checkpoint
Confirm logistics assumptions
Output
Dispatch coordination record
06

Document coordination

Review records applicable to the transaction in scope.

Input
Product, supplier, shipment and destination context
Control
Check the document list and outstanding confirmations
Buyer checkpoint
Review applicable document status
Output
Buyer-facing handover summary